Approximately 500 tonnes of steelwork for a multi-storey parking structure in Shenzhen.
JJHI fabricated approximately 500 tonnes of structural steel for a multi-storey parking structure in Shenzhen. Steel framing allows parking decks to be raised quickly on a constrained urban site.
The package covered columns, beams, deck-support steelwork and the ramps and stairs that connect the parking levels, all fabricated in Taishan and delivered to programme.
Every contract runs through the same chain in our 32,000 m² plant in Taishan, Jiangmen: cutting, assembly, welding, surface preparation, coating and packing.