A covered steel footbridge connecting buildings on a vocational college campus.
This footbridge links buildings on a vocational college campus, carrying pedestrians in a covered, weather-protected walkway above ground level.
JJHI fabricated the bridge girders, canopy framing and railings. Canopy and cladding supports had to be set out precisely so that the covering and glazing could be installed on site without rework.
Every contract runs through the same chain in our 32,000 m² plant in Taishan, Jiangmen: cutting, assembly, welding, surface preparation, coating and packing.



Custom Structure
Asia Symbol
Excavation Steelwork · Hong Kong
Nearly one hundred structural-steel fabrication projects completed — see tonnage, dates and locations on the projects page.
Send us your drawings and we will come back with a fabrication and delivery plan for your steelwork.
Request a Quote